KENTUCKY TRANSPORTATION CABINET
| Contract ID | 051132 | Primary Project Number | DE05900170532 |
| Contract Description | COVINGTON-INDEPENDENCE ROAD (KY 17) JL01 | ||
| Primary County | KENTON | Fed/St Number | FD04 059 0017 009-016 |
| Vendor ID | 00111 | Vendor Name | JUDY CONSTRUCTION COMPANY |
| Bid Amount | $ 15,239,498.61 | ||
| SM- Project | DE05900170532 |
| Fed/State Number | FD04 059 0017 009-016 |
| Project Description | COVINGTON-INDEPENDENCE ROAD (KY 17) JL01 |
| *********** |
| SM- Project | DE05900170532 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY | 25079 |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0010 | DRAINAGE BLANKET-EMBANKMENT | 00021 | 32,931.000 |
48,584.000 |
$24.510 |
CUYD | 5.3 |
| 0020 | PERFORATED PIPE-4 INCH | 01000 | 271.000 |
271.000 |
$12.000 |
LF | 0.0 |
| 0030 | PERFORATED PIPE-8 INCH | 01002 | 4,526.000 |
4,526.000 |
$7.000 |
LF | 0.2 |
| 0040 | NON-PERFORATED PIPE-4 INCH | 01010 | 16.000 |
16.000 |
$22.000 |
LF | 0.0 |
| 0050 | NON-PERFORATED PIPE-8 INCH | 01012 | 2,223.000 |
2,223.000 |
$7.000 |
LF | 0.1 |
| 0060 | PERF PIPE HEADWALL TY 2-8 INCH | 01026 | 11.000 |
11.000 |
$500.000 |
EACH | 0.0 |
| 0070 | PERF PIPE HEADWALL TY 3-8 INCH | 01030 | 13.000 |
13.000 |
$550.000 |
EACH | 0.0 |
| 0080 | PERF PIPE HEADWALL TY 4-8 INCH | 01034 | 2.000 |
2.000 |
$550.000 |
EACH | 0.0 |
| 0090 | FILL AND CAP WELL | 01711 | 1.000 |
1.000 |
$700.000 |
EACH | 0.0 |
| 0100 | STANDARD CURB AND GUTTER | 01810 | 7,717.130 |
7,717.130 |
$16.000 |
LF | 0.8 |
| 0110 | ISLAND CURB AND GUTTER | 01825 | 50.000 |
50.000 |
$25.000 |
LF | 0.0 |
| 0120 | ISLAND INTEGRAL CURB | 01845 | 44.500 |
44.500 |
$25.000 |
LF | 0.0 |
| 0130 | REMOVE PAVEMENT | 02091 | 869.000 |
869.000 |
$9.000 |
SQYD | 0.1 |
| 0140 | CEM CONC ENT PAVEMENT-8 INCH | 02101 | 291.800 |
291.800 |
$70.000 |
SQYD | 0.1 |
| 0150 | GRANULAR EMBANKMENT | 02223 | 3,406.000 |
3,406.000 |
$21.000 |
CUYD | 0.5 |
| 0160 | EMBANKMENT IN PLACE | 02230 | 981,777.000 |
1,021,492.000 |
$2.400 |
CUYD | 15.5 |
| 0170 | WATER | 02242 | 1,200.000 |
1,200.000 |
$0.010 |
MGAL | 0.0 |
| 0180 | FENCE-WOVEN WIRE | 02261 | 27,740.000 |
27,740.000 |
$4.630 |
LF | 0.8 |
| 0190 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 12,512.500 |
12,512.500 |
$14.750 |
LF | 1.2 |
| 0200 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 9.000 |
9.000 |
$41.000 |
EACH | 0.0 |
| 0210 | GUARDRAIL CONNECTOR TO BRIDGE END TY A | 02363 | 4.000 |
4.000 |
$2,032.000 |
EACH | 0.1 |
| 0220 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 19.000 |
19.000 |
$2,971.000 |
EACH | 0.4 |
| 0230 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 15.000 |
15.000 |
$435.000 |
EACH | 0.0 |
| 0240 | GUARDRAIL END TREATMENT TYPE 3 | 02373 | 5.000 |
5.000 |
$450.000 |
EACH | 0.0 |
| 0250 | TEMPORARY GUARDRAIL | 02397 | 200.000 |
200.000 |
$11.000 |
LF | 0.0 |
| 0260 | R/W MARKER RURAL TYPE 1 | 02434 | 120.000 |
120.000 |
$79.500 |
EACH | 0.1 |
| 0270 | CHANNEL LINING CLASS II | 02483 | 10,680.000 |
10,680.000 |
$23.000 |
TON | 1.6 |
| 0280 | CHANNEL LINING CLASS III | 02484 | 7,037.000 |
7,037.000 |
$24.000 |
TON | 1.1 |
| 0290 | CLEARING AND GRUBBING 129 ACRES | 02545 | 1.000 |
1.000 |
$808,380.000 |
LS | 5.3 |
| 0300 | SIGNS | 02562 | 1,465.000 |
1,465.000 |
$22.000 |
SQFT | 0.2 |
| 0310 | EDGE KEY | 02585 | 242.990 |
242.990 |
$11.000 |
LF | 0.0 |
| 0320 | FABRIC-GEOTEXTILE TYPE III | 02598 | 6,054.000 |
6,054.000 |
$1.250 |
SQYD | 0.0 |
| 0330 | FABRIC-GEOTEXTILE TYPE IV | 02599 | 248,381.000 |
343,183.000 |
$1.350 |
SQYD | 2.2 |
| 0340 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$80,000.000 |
LS | 0.5 |
| 0350 | DIVERSIONS (BY-PASS DETOURS) | 02651 | 1.000 |
1.000 |
$270,000.000 |
LS | 1.8 |
| 0360 | LANE CLOSURE | 02653 | 14.000 |
14.000 |
$1,000.000 |
EACH | 0.1 |
| 0370 | TEMPORARY SILT FENCE | 02701 | 1,181.000 |
1,181.000 |
$2.000 |
LF | 0.0 |
| 0380 | SILT TRAP TYPE C | 20496NS843 | 38.000 |
38.000 |
$200.000 |
EACH | 0.0 |
| 0390 | SILT TRAP TYPE A ALTERNATE 2 | 02703 | 50.000 |
50.000 |
$100.000 |
EACH | 0.0 |
| 0400 | SILT TRAP TYPE B | 02704 | 121.000 |
121.000 |
$250.000 |
EACH | 0.2 |
| 0410 | CLEAN SILT TRAP TYPE C | 20497NS843 | 114.000 |
114.000 |
$50.000 |
EACH | 0.0 |
| 0420 | CLEAN SILT TRAP TYPE A | 02706 | 150.000 |
150.000 |
$50.000 |
EACH | 0.0 |
| 0430 | CLEAN SILT TRAP TYPE B | 02707 | 363.000 |
363.000 |
$50.000 |
EACH | 0.1 |
| 0440 | CLEAN TEMPORARY SILT FENCE | 02709 | 3,543.000 |
3,543.000 |
$0.150 |
LF | 0.0 |
| 0450 | SIDEWALK-4 INCH CONCRETE | 02720 | 4,232.400 |
4,232.400 |
$28.000 |
SQYD | 0.8 |
| 0460 | STAKING | 02726 | 1.000 |
1.000 |
$100,000.000 |
LS | 0.7 |
| 0470 | FLASHING ARROW | 02775 | 2.000 |
2.000 |
$1,200.000 |
EACH | 0.0 |
| 0480 | EROSION CONTROL BLANKET | 05950 | 24,614.000 |
24,614.000 |
$1.200 |
SQYD | 0.2 |
| 0490 | TEMP SEEDING AND PROTECTION | 05953 | 33,200.000 |
33,200.000 |
$0.210 |
SQYD | 0.0 |
| 0500 | TOPDRESSING FERTILIZER | 05966 | 17.200 |
17.200 |
$475.000 |
TON | 0.1 |
| 0510 | SEEDING AND PROTECTION | 05985 | 332,000.000 |
332,000.000 |
$0.270 |
SQYD | 0.6 |
| 0520 | SPECIAL SEEDING CROWN VETCH | 05989 | 66,517.000 |
66,517.000 |
$0.180 |
SQYD | 0.1 |
| 0530 | SODDING | 05990 | 616.000 |
616.000 |
$5.500 |
SQYD | 0.0 |
| 0540 | TEMPORARY MULCH | 05952 | 332,000.000 |
332,000.000 |
$0.110 |
SQYD | 0.2 |
| 0550 | TEMPORARY SILT DITCH | 20594ES213 | 15,589.000 |
15,589.000 |
$0.250 |
LF | 0.0 |
| 0560 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 17,440.000 |
17,440.000 |
$1.220 |
LF | 0.1 |
| 0570 | PAVE STRIPING-TEMP REM TAPE-Y | 06551 | 16,120.000 |
16,120.000 |
$1.220 |
LF | 0.1 |
| 0580 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 33,950.000 |
33,950.000 |
$0.170 |
LF | 0.0 |
| 0590 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 99,683.000 |
99,683.000 |
$0.160 |
LF | 0.1 |
| 0600 | PAVE MARKING-THERMO X-WALK-6 INCH | 06565 | 1,692.000 |
1,692.000 |
$2.950 |
LF | 0.0 |
| 0610 | PAVE MARKING-THERMO STOP BAR-12IN | 06567 | 409.000 |
409.000 |
$4.650 |
LF | 0.0 |
| 0620 | PAVE MARKING-PRE THERM STR ARROW | 06573 | 6.000 |
6.000 |
$85.000 |
EACH | 0.0 |
| 0630 | PAVE MARKING-PRE THERM CURV ARROW | 06574 | 62.000 |
62.000 |
$82.500 |
EACH | 0.0 |
| 0640 | PAVE MARKING-PRE THERM COMB ARROW | 06575 | 1.000 |
1.000 |
$142.500 |
EACH | 0.0 |
| 0650 | PAVEMENT MARKER TY IVA-MW TEMP | 06585 | 7.000 |
7.000 |
$5.750 |
EACH | 0.0 |
| 0660 | PAVEMENT MARKER TY IVA-BY TEMP | 06588 | 706.000 |
706.000 |
$5.750 |
EACH | 0.0 |
| 0670 | PAVEMENT MARKER TYPE V-MW | 06589 | 160.000 |
160.000 |
$23.250 |
EACH | 0.0 |
| 0680 | PAVEMENT MARKER TYPE V-BY | 06591 | 361.000 |
361.000 |
$23.250 |
EACH | 0.1 |
| 0690 | PAVEMENT MARKER TYPE V-B W/R | 06592 | 300.000 |
300.000 |
$23.250 |
EACH | 0.0 |
| 0700 | PAVE MARKING THERMO-BIKE | 20782NS714 | 8.000 |
8.000 |
$225.000 |
EACH | 0.0 |
| 0710 | INSTALL PROJECT IDENTIFICATION SIGNS | 20588NC | 2.000 |
2.000 |
$350.000 |
EACH | 0.0 |
| 0720 | GAS & UTILITY COORDINATION | 20224MD | 1.000 |
1.000 |
$20,000.000 |
LS | 0.1 |
| 0730 | CULVERT PIPE-15 INCH | 00461 | 100.000 |
100.000 |
$25.720 |
LF | 0.0 |
| 0740 | CULVERT PIPE-18 INCH | 00462 | 2,905.000 |
2,905.000 |
$32.000 |
LF | 0.6 |
| 0750 | CULVERT PIPE-24 INCH | 00464 | 770.260 |
770.260 |
$40.080 |
LF | 0.2 |
| 0760 | CULVERT PIPE-30 INCH | 00466 | 579.000 |
579.000 |
$46.000 |
LF | 0.2 |
| 0780 | CULVERT PIPE-36 INCH | 00468 | 432.000 |
432.000 |
$71.000 |
LF | 0.2 |
| 0790 | CULVERT PIPE-48 INCH | 00470 | 374.000 |
374.000 |
$87.410 |
LF | 0.2 |
| 0800 | CULVERT PIPE-54 INCH | 00471 | 649.000 |
649.000 |
$107.000 |
LF | 0.5 |
| 0810 | CULVERT PIPE-15 INCH EQUIV | 00490 | 41.000 |
41.000 |
$82.000 |
LF | 0.0 |
| 0820 | STORM SEWER PIPE-15 INCH | 00521 | 78.000 |
78.000 |
$35.000 |
LF | 0.0 |
| 0830 | STORM SEWER PIPE-18 INCH | 00522 | 4,565.000 |
4,565.000 |
$31.000 |
LF | 0.9 |
| 0840 | STORM SEWER PIPE-24 INCH | 00524 | 1,212.000 |
1,212.000 |
$42.000 |
LF | 0.3 |
| 0850 | STORM SEWER PIPE-30 INCH | 00526 | 56.000 |
56.000 |
$53.000 |
LF | 0.0 |
| 0860 | STORM SEWER PIPE-36 INCH | 00528 | 108.000 |
108.000 |
$60.000 |
LF | 0.0 |
| 0870 | ENTRANCE PIPE-15 INCH | 00440 | 1,074.000 |
1,074.000 |
$21.280 |
LF | 0.2 |
| 0880 | ENTRANCE PIPE-24 INCH | 00443 | 87.000 |
87.000 |
$34.660 |
LF | 0.0 |
| 0890 | SLOTTED DRAIN PIPE-15 INCH | 00981 | 42.000 |
42.000 |
$160.000 |
LF | 0.0 |
| 0900 | SLOPED BOX OUTLET TYPE 1-18 IN | 01433 | 9.000 |
9.000 |
$1,400.000 |
EACH | 0.1 |
| 0910 | SLOPED BOX OUTLET TYPE 1-24 IN | 01434 | 4.000 |
4.000 |
$2,500.000 |
EACH | 0.1 |
| 0920 | SLOPED BOX INLET-OUTLET TYPE 1 | 01440 | 2.000 |
2.000 |
$2,500.000 |
EACH | 0.0 |
| 0930 | S & F BOX INLET-OUTLET-18 INCH | 01450 | 8.000 |
8.000 |
$1,800.000 |
EACH | 0.1 |
| 0940 | S & F BOX INLET-OUTLET-24 INCH | 01451 | 4.000 |
4.000 |
$2,300.000 |
EACH | 0.1 |
| 0950 | S & F BOX INLET-OUTLET-30 INCH | 01452 | 3.000 |
3.000 |
$3,200.000 |
EACH | 0.1 |
| 0960 | S & F BOX INLET-OUTLET-36 INCH | 01453 | 3.000 |
3.000 |
$5,800.000 |
EACH | 0.1 |
| 0970 | CURB BOX INLET TYPE A | 01456 | 31.000 |
31.000 |
$2,800.000 |
EACH | 0.6 |
| 0980 | CURB BOX INLET TYPE B | 01480 | 2.000 |
2.000 |
$2,900.000 |
EACH | 0.0 |
| 0990 | DROP BOX INLET TYPE 1 | 01490 | 9.000 |
9.000 |
$2,000.000 |
EACH | 0.1 |
| 1000 | DROP BOX INLET TYPE 3 | 01496 | 8.000 |
8.000 |
$3,500.000 |
EACH | 0.2 |
| 1010 | DROP BOX INLET TYPE 5B | 01505 | 22.000 |
22.000 |
$2,400.000 |
EACH | 0.3 |
| 1020 | MANHOLE TYPE B | 01761 | 2.000 |
2.000 |
$3,000.000 |
EACH | 0.0 |
| 1030 | CONCRETE-CLASS A | 08100 | 55.370 |
55.370 |
$900.000 |
CUYD | 0.3 |
| 1040 | STEEL REINFORCEMENT | 08150 | 2,337.000 |
2,337.000 |
$2.000 |
LB | 0.0 |
| 1050 | CRUSHED AGGREGATE SIZE NO 57 | 00071 | 6.000 |
6.000 |
$28.000 |
TON | 0.0 |
| 1070 | DITCH EXCAVATION | 20597EC | 1,570.500 |
1,570.500 |
$6.000 |
CUYD | 0.1 |
| 1080 | NON-PERFORATED PIPE-6 INCH | 01011 | 3.000 |
3.000 |
$7.000 |
LF | 0.0 |
| 1090 | CL1 ASPH SURF 0.38D PG64-22 | 00300 | 1,526.000 |
1,526.000 |
$36.000 |
TON | 0.4 |
| 1100 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 1,198.000 |
1,198.000 |
$36.000 |
TON | 0.3 |
| 1110 | CL2 ASPH SURF 0.38C PG64-22 | 00304 | 1,094.000 |
1,094.000 |
$42.000 |
TON | 0.3 |
| 1120 | CL2 ASPH SURF 0.50D PG64-22 | 00309 | 3,400.000 |
3,400.000 |
$32.750 |
TON | 0.7 |
| 1130 | CL3 ASPH SURF 0.50B PG64-22 | 00324 | 8,371.000 |
8,659.750 |
$35.500 |
TON | 2.0 |
| 1140 | CL2 ASPH BASE 0.75D PG64-22 | 00221 | 22,833.000 |
22,833.000 |
$30.750 |
TON | 4.6 |
| 1150 | CL3 ASPH BASE 0.75D PG64-22 | 00223 | 51,519.000 |
53,299.630 |
$30.000 |
TON | 10.1 |
| 1160 | DGA BASE | 00001 | 96,628.000 |
97,519.250 |
$15.900 |
TON | 10.1 |
| 1170 | TRAFFIC BOUND BASE | 00020 | 10,000.000 |
10,000.000 |
$10.860 |
TON | 0.7 |
| 1180 | ASPHALT SEAL AGGREGATE | 00100 | 474.000 |
474.000 |
$36.600 |
TON | 0.1 |
| 1190 | EMULSIFIED ASPHALT RS-2 | 00291 | 57.000 |
57.000 |
$250.000 |
TON | 0.1 |
| 1200 | JPC PAVEMENT-6 INCH | 02075 | 314.000 |
314.000 |
$75.000 |
SQYD | 0.2 |
| 1210 | JPC PAVEMENT-8 INCH | 02084 | 82.000 |
82.000 |
$100.000 |
SQYD | 0.1 |
| 8000 | BARRICADE-TYPE III | 02014 | 0.000 |
20.000 |
$275.000 |
EACH | 0.0 |
| 8001 | GUARDRAIL END TREATMENT TYPE 7 | 02371 | 0.000 |
2.000 |
$1,200.000 |
EACH | 0.0 |
| 8004 | FUEL ADJUSTMENT | 10020NS | 0.000 |
445,144.540 |
$1.000 |
DOLL | 0.0 |
| 8005 | ASPHALT ADJUSTMENT | 10030NS | 0.000 |
849,213.730 |
$1.000 |
DOLL | 0.0 |
| 8006 | LOT PAY ADJUSTMENT | 10000NS | 0.000 |
35,268.280 |
$1.000 |
DOLL | 0.0 |
| 8007 | RIDE QUALITY ADJUSTMENT ASPH | 10005NS | 0.000 |
2,412.350 |
$1.000 |
DOLL | 0.0 |
| 8008 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 0.000 |
482.000 |
$9.700 |
LF | 0.0 |
| 8009 | PAVE STRIPING-TEMP REM TAPE-B | 06549 | 0.000 |
86.000 |
$3.230 |
LF | 0.0 |
| 8010 | REMOVE Symbol | 09326M03 | 0.000 |
8.000 |
$68.250 |
EACH | 0.0 |
| 8011 | PAVE STRIPING REMOVAL-4 INCH | 06530 | 0.000 |
1,173.000 |
$1.110 |
LF | 0.0 |
| 8012 | PAVE STRIPING REMOVAL-6 INCH | 06531 | 0.000 |
195.000 |
$0.650 |
LF | 0.0 |
| 8013 | PAVE STRIPING REMOVAL-12 INCH | 06533 | 0.000 |
34.000 |
$2.990 |
LF | 0.0 |
| 8014 | PAVE MARKING-PAINT CROSS-HATCH | 06570 | 0.000 |
234.000 |
$2.310 |
SQFT | 0.0 |
| 8015 | EW~ Revise Manhole | 10090NX | 0.000 |
1.000 |
$1,374.550 |
LS | 0.0 |
| 8016 | EW~ Revise Drop Box Inlet | 10090NX | 0.000 |
1.000 |
$317.320 |
LS | 0.0 |
| 8017 | EW~ Core Box | 10090NX | 0.000 |
1.000 |
$197.700 |
LS | 0.0 |
| 8018 | REMOVE PIPE | 01310 | 0.000 |
70.000 |
$11.170 |
LF | 0.0 |
| 8019 | EW~ Regrade Parcel 757 | 10090NX | 0.000 |
1.000 |
$906.010 |
LS | 0.0 |
| 8020 | ASPH PAVE MILLING & TEXTURING | 02677 | 0.000 |
220.190 |
$33.510 |
TON | 0.0 |
| 8021 | EW~ Snow Removal | 10103NX | 0.000 |
6.000 |
$80.450 |
HOUR | 0.0 |
Category Total $11,801,245.34 |
| SM- Project | DE05900170532 | CATEGORY NUMBER | 0002 | CATEGORY Description | BRIDGE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1220 | CONCRETE-CLASS A | 08100 | 288.300 |
288.300 |
$375.000 |
CUYD | 0.7 |
| 1230 | CONCRETE-CLASS AA | 08104 | 590.400 |
590.400 |
$400.000 |
CUYD | 1.5 |
| 1240 | STEEL REINFORCEMENT | 08150 | 62,040.000 |
62,040.000 |
$0.650 |
LB | 0.3 |
| 1250 | STEEL REINF-EPOXY COATED | 08151 | 153,164.000 |
153,164.000 |
$0.720 |
LB | 0.7 |
| 1260 | PRECAST PC I BEAM TYPE 4 | 08634 | 1,782.700 |
1,782.700 |
$156.000 |
LF | 1.8 |
| 1270 | TEST PILES | 08033 | 55.000 |
55.000 |
$50.000 |
LF | 0.0 |
| 1280 | PILES-STEEL HP12X53 | 08046 | 624.000 |
624.000 |
$27.000 |
LF | 0.1 |
| 1290 | FOUNDATION PREPARATION BRIDGE | 08003 | 1.000 |
1.000 |
$8,500.000 |
LS | 0.1 |
| 1300 | PILE POINTS-12 INCH | 08094 | 26.000 |
26.000 |
$161.000 |
EACH | 0.0 |
| 1310 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 45.000 |
45.000 |
$65.000 |
CUYD | 0.0 |
| 1320 | STRUCTURE GRANULAR BACKFILL | 02231 | 140.000 |
140.000 |
$38.000 |
CUYD | 0.0 |
| 1330 | CYCLOPEAN STONE RIP RAP | 08019 | 3,375.000 |
3,375.000 |
$24.000 |
TON | 0.5 |
| 1340 | FABRIC-GEOTEXTILE TYPE I | 02596 | 3,070.000 |
3,070.000 |
$1.900 |
SQYD | 0.0 |
| 1350 | MASONRY COATING | 02998 | 1,435.000 |
1,435.000 |
$10.000 |
SQYD | 0.1 |
| 1360 | ARMORED EDGE FOR CONCRETE | 03299 | 131.100 |
131.100 |
$46.000 |
LF | 0.0 |
| 8002 | EW~ Shim Bridge Beams | 10090NX | 0.000 |
1.000 |
$23,800.790 |
LS | 0.0 |
Category Total $920,720.38 |
| SM- Project | DE05900170532 | CATEGORY NUMBER | 0003 | CATEGORY Description | BRIDGE | 25079 |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1370 | CONCRETE-CLASS A | 08100 | 734.600 |
734.600 |
$375.000 |
CUYD | 1.8 |
| 1380 | STEEL REINFORCEMENT | 08150 | 116,675.000 |
116,675.000 |
$0.650 |
LB | 0.5 |
| 1390 | FOUNDATION PREPARATION CULVERT | 08003 | 1.000 |
1.000 |
$48,500.000 |
LS | 0.3 |
| 1400 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 22.000 |
22.000 |
$65.000 |
CUYD | 0.0 |
Category Total $401,243.75 |
| SM- Project | DE05900170532 | CATEGORY NUMBER | 0004 | CATEGORY Description | SIGNALIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1410 | CONDUIT-1 1/4 INCH | 04793 | 983.000 |
983.000 |
$3.600 |
LF | 0.0 |
| 1420 | CONDUIT-2 INCH | 04795 | 40.000 |
40.000 |
$9.800 |
LF | 0.0 |
| 1430 | JUNCTION BOX TYPE B | 04811 | 8.000 |
8.000 |
$190.000 |
EACH | 0.0 |
| 1440 | TRENCHING AND BACKFILLING | 04820 | 973.000 |
973.000 |
$3.600 |
LF | 0.0 |
| 1450 | LOOP WIRE | 04830 | 3,078.000 |
3,078.000 |
$0.150 |
LF | 0.0 |
| 1460 | CABLE-NO. 14/5C | 04844 | 1,470.000 |
1,470.000 |
$1.100 |
LF | 0.0 |
| 1470 | CABLE-NO. 14/7C | 04845 | 777.000 |
777.000 |
$1.200 |
LF | 0.0 |
| 1480 | CABLE-NO. 14/1 PAIR | 04850 | 5,234.000 |
5,234.000 |
$1.100 |
LF | 0.0 |
| 1490 | MESSENGER-10800 LB | 04885 | 536.000 |
536.000 |
$5.750 |
LF | 0.0 |
| 1500 | LOOP SAW SLOT AND FILL | 04895 | 1,238.000 |
1,238.000 |
$5.600 |
LF | 0.0 |
| 1510 | INSTALL LED SIGNAL-3 SECTION | 07636 | 8.000 |
8.000 |
$250.000 |
EACH | 0.0 |
| 1520 | PEDESTRIAN DETECTOR | 04900 | 8.000 |
8.000 |
$180.000 |
EACH | 0.0 |
| 1530 | INSTALL PEDESTRIAN HEAD-LED | 20093ES835 | 8.000 |
8.000 |
$250.000 |
EACH | 0.0 |
| 1540 | INSTALL CONTROLLER TYPE 170 | 04931 | 1.000 |
1.000 |
$1,760.000 |
EACH | 0.0 |
| 1550 | INSTALL STEEL STRAIN POLE | 04932 | 4.000 |
4.000 |
$2,800.000 |
EACH | 0.1 |
| 1560 | REMOVE SIGNAL EQUIPMENT | 04950 | 1.000 |
1.000 |
$1,250.000 |
EACH | 0.0 |
| 8003 | EW~ Signal System Reconstruction | 10090NX | 0.000 |
1.000 |
$8,869.820 |
LS | 0.0 |
Category Total $47,386.90 |
| SM- Project | DE05900170532 | CATEGORY NUMBER | 0005 | CATEGORY Description | WATER LINE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1570 | DUCTILE IRON PIPE-8 INCH CLASS 50 W/POLYWRAP | 01095 | 960.000 |
960.000 |
$46.300 |
LF | 0.3 |
| 1580 | DUCTILE IRON PIPE-12 INCH CLASS 50 W/POLYWRAP | 01099 | 510.000 |
510.000 |
$58.000 |
LF | 0.2 |
| 1590 | DUCTILE IRON PIPE-16 INCH CLASS 50/POLYWRAP | 01103 | 2,535.000 |
2,535.000 |
$69.750 |
LF | 1.2 |
| 1591 | GATE VALVE-6 INCH | 03526 | 7.000 |
7.000 |
$610.000 |
EACH | 0.0 |
| 1592 | GATE VALVE-8 INCH | 03528 | 5.000 |
5.000 |
$855.000 |
EACH | 0.0 |
| 1593 | GATE VALVE-12 INCH | 03532 | 1.000 |
1.000 |
$1,465.000 |
EACH | 0.0 |
| 1600 | BUTTERFLY VALVE | 20139EC | 8.000 |
8.000 |
$3,800.000 |
EACH | 0.2 |
| 1610 | TEE AND BLOCK 8"X8"X6" | 20551NC | 1.000 |
1.000 |
$250.000 |
EACH | 0.0 |
| 1620 | TEE AND BLOCK 8"X8"X8" | 20552NC | 1.000 |
1.000 |
$270.000 |
EACH | 0.0 |
| 1621 | ANCHOR TEE AND BLOCK 8"X8"X6" | 20784ND | 1.000 |
1.000 |
$250.000 |
EACH | 0.0 |
| 1622 | ANCHOR TEE AND BLOCK 16"X16"X6" | 20785ND | 5.000 |
5.000 |
$915.000 |
EACH | 0.0 |
| 1623 | TEE AND BLOCK 16"X16"X8" | 20786ND | 2.000 |
2.000 |
$930.000 |
EACH | 0.0 |
| 1624 | DUCTILE IRON CROSS 16"X16" | 20787ND | 1.000 |
1.000 |
$1,620.000 |
EACH | 0.0 |
| 1630 | BEND AND BLOCK-6" | 20554NC | 10.000 |
10.000 |
$250.000 |
EACH | 0.0 |
| 1640 | BEND AND BLOCK-8" | 20555NC | 7.000 |
7.000 |
$260.000 |
EACH | 0.0 |
| 1641 | BEND AND BLOCK-12" | 20788ND | 3.000 |
3.000 |
$360.000 |
EACH | 0.0 |
| 1642 | BEND AND BLOCK-16" | 20789ND | 7.000 |
7.000 |
$805.000 |
EACH | 0.0 |
| 1650 | CONNECT TO 6" | 20559NC | 5.000 |
5.000 |
$1,500.000 |
EACH | 0.0 |
| 1660 | CONNECT TO 8" | 07648 | 3.000 |
3.000 |
$2,000.000 |
EACH | 0.0 |
| 1661 | CONNECT TO 12" | 20790ND | 2.000 |
2.000 |
$2,500.000 |
EACH | 0.0 |
| 1670 | RELOCATE FIRE HYDRANT | 03433 | 6.000 |
6.000 |
$500.000 |
EACH | 0.0 |
| 1680 | FIRE HYDRANT ASSEMBLY | 20156EC | 1.000 |
1.000 |
$2,700.000 |
EACH | 0.0 |
| 1690 | RELOCATE WATER METER ALL SIZES | 03431 | 14.000 |
14.000 |
$250.000 |
EACH | 0.0 |
| 1700 | COPPER PIPE-3/4 INCH | 03360 | 970.000 |
970.000 |
$20.000 |
LF | 0.1 |
| 1710 | COPPER PIPE-1 INCH | 03361 | 845.000 |
845.000 |
$20.000 |
LF | 0.1 |
| 1720 | RECONNECT TO MAIN | 03438 | 13.000 |
13.000 |
$60.000 |
EACH | 0.0 |
| 1730 | RECONNECT SERVICE | 03437 | 17.000 |
17.000 |
$50.000 |
EACH | 0.0 |
| 1731 | ADJUST WATER VALVE BOXES | 20792ND | 9.000 |
9.000 |
$50.000 |
EACH | 0.0 |
| 1740 | ADJUST FIRE HYDRANT | 03426 | 1.000 |
1.000 |
$500.000 |
EACH | 0.0 |
| 1750 | PLUG AND BLOCK-8" | 20556NC | 1.000 |
1.000 |
$200.000 |
EACH | 0.0 |
| 1751 | PLUG AND BLOCK-16" | 20793ND | 3.000 |
3.000 |
$550.000 |
EACH | 0.0 |
| 1752 | REDUCER 8"X6" | 20794ND | 4.000 |
4.000 |
$200.000 |
EACH | 0.0 |
| 1753 | REDUCER 16"X12" | 20795ND | 2.000 |
2.000 |
$460.000 |
EACH | 0.0 |
| 1760 | AIR RELEASE VALVE | 03495 | 5.000 |
5.000 |
$700.000 |
EACH | 0.0 |
| 8022 | CONNECT TO WATER MAIN 16" | 20081MC | 0.000 |
1.000 |
$4,400.000 |
EACH | 0.0 |
| 8023 | ANCHOR TEE AND BLOCK 16x16x16 | 21526ND | 0.000 |
1.000 |
$1,700.000 |
EACH | 0.0 |
Category Total $384,764.25 |
| SM- Project | DE05900170532 | CATEGORY NUMBER | 0006 | CATEGORY Description | DEMOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1770 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$713,086.000 |
LS | 4.7 |
| 1780 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$214,677.000 |
LS | 1.4 |
Category Total $927,763.00 |
| SM- Project | DE05900170532 | CATEGORY NUMBER | 0007 | CATEGORY Description | SEWER |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1790 | PVC PIPE-8 INCH | 03387 | 2,145.000 |
2,145.000 |
$21.650 |
LF | 0.3 |
| 1800 | DUCTILE IRON PIPE-8 INCH | 01095 | 268.000 |
268.000 |
$60.750 |
LF | 0.1 |
| 1801 | PVC PIPE-8 INCH FORCE MAIN SDR 26 | 03387 | 457.000 |
457.000 |
$13.700 |
LF | 0.0 |
| 1810 | PVC PIPE-4 INCH | 03383 | 100.000 |
100.000 |
$40.000 |
LF | 0.0 |
| 1811 | PVC PIPE-15" | 20796ED | 1,148.000 |
1,148.000 |
$52.250 |
LF | 0.4 |
| 1820 | DUCTILE IRON PIPE-16 INCH | 01103 | 230.000 |
230.000 |
$93.250 |
LF | 0.1 |
| 1830 | STEEL ENCASEMENT PIPE-16 INCH 5/16 INCH WALL | 01073 | 1,738.000 |
1,738.000 |
$144.700 |
LF | 1.7 |
| 1831 | RUBBER END SEAL FOR 8" PVC | 20797ND | 10.000 |
10.000 |
$70.000 |
EACH | 0.0 |
| 1832 | STAINLESS STEEL SPACERS FOR 8" PVC | 20798ND | 417.000 |
417.000 |
$94.000 |
EACH | 0.3 |
| 1840 | STEEL ENCASEMENT PIPE-30" 1/2 INCH WALL | 20134EC | 160.000 |
160.000 |
$350.500 |
LF | 0.4 |
| 1841 | RUBBER END SEAL FOR 15" PVC | 20799ND | 2.000 |
2.000 |
$100.000 |
EACH | 0.0 |
| 1842 | STAINLESS STEEL SPACERS FOR 15" PVC | 20800ND | 40.000 |
40.000 |
$165.000 |
EACH | 0.0 |
| 1850 | SANITARY SEWER MANHOLE | 01799 | 26.000 |
26.000 |
$3,500.000 |
EACH | 0.6 |
| 1860 | REMOVE MANHOLE | 01787 | 1.000 |
1.000 |
$250.000 |
EACH | 0.0 |
| 1870 | FILL AND CAP MANHOLE | 01786 | 18.000 |
18.000 |
$250.000 |
EACH | 0.0 |
| 1871 | PLUG 8" PVC LINE W/CONC | 20801ND | 11.000 |
11.000 |
$50.000 |
EACH | 0.0 |
| 1880 | CONCRETE ENCASEMENT WITH REINFORCING | 20057ES601 | 60.000 |
60.000 |
$80.000 |
LF | 0.0 |
| 1881 | CONCRETE BLOCKING FOR FORCE MAIN | 20802ND | 3.000 |
3.000 |
$100.000 |
EACH | 0.0 |
| 1890 | RECONSTRUCT MANHOLE | 01789 | 1.000 |
1.000 |
$250.000 |
EACH | 0.0 |
| 1891 | SILT FENCE FOR SEWER CONSTRUCTION | 20803ED | 200.000 |
200.000 |
$4.000 |
LF | 0.0 |
| 1892 | CONCRETE SLOPE BOX | 20804ND | 1.000 |
1.000 |
$500.000 |
EACH | 0.0 |
| 1900 | SAFELOADING | 02690 | 10.000 |
10.000 |
$100.000 |
CUYD | 0.0 |
Category Total $612,628.25 |
| SM- Project | DE05900170532 | CATEGORY NUMBER | 0008 | CATEGORY Description | UTILITY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1909 | GAS MAIN 2" PL INSTALL | 20805ED | 560.000 |
560.000 |
$19.120 |
LF | 0.1 |
| 1910 | GAS MAIN 4" PL INSTALL | 20713ED | 1,192.000 |
1,192.000 |
$19.120 |
LF | 0.1 |
| 1911 | GAS MAIN 2" SWPC INSTALL | 20806ED | 140.000 |
140.000 |
$23.420 |
LF | 0.0 |
| 1912 | GAS FEEDER LINE 4" SWPC INSTALL | 20807ED | 1,127.000 |
1,127.000 |
$23.420 |
LF | 0.2 |
| 1913 | GAS FEEDER LINE 6" SWPC INSTALL | 20808ED | 1,125.000 |
1,125.000 |
$27.070 |
LF | 0.2 |
| 1914 | HYDROSTATIC TEST | 20809ND | 4.000 |
4.000 |
$2,500.000 |
EACH | 0.1 |
| 1920 | TIE-IN 2 INCH | 03463 | 3.000 |
3.000 |
$2,200.000 |
EACH | 0.0 |
| 1930 | TIE-IN 4 INCH | 03464 | 9.000 |
9.000 |
$2,500.000 |
EACH | 0.1 |
| 1940 | TIE-IN 6 INCH | 03466 | 1.000 |
1.000 |
$3,500.000 |
EACH | 0.0 |
| 1941 | EXCAVATE TRENCH AND LOWER STEEL GAS MAIN | 20810ED | 240.000 |
240.000 |
$14.340 |
LF | 0.0 |
| 1942 | INSTALL M-C LONG-SIDE SERVICE PIPING-1" | 20811ND | 6.000 |
6.000 |
$500.000 |
EACH | 0.0 |
| 1943 | INSTALL M-C SHORT-SIDE SERVICE PIPING-1" | 20812ND | 4.000 |
4.000 |
$270.000 |
EACH | 0.0 |
Category Total $143,746.73 |